As they were reviewing yesterday's work, it was realized that the basement was not deep enough, so the excavator had to dig it again and go another 5.5 inches deeper. So when that was done, he continued the digging for the footings around the garages.
Front garage
Deeper basement
Dave had also made arrangements with him to pull up some trees on the hillside and then dig a hole to bury them. Dave spent much of Monday clearing the fence line along the north side of the property. It looks much better now, but still a lot of work to go, like ripping out old barbwire for one thing.
Brush from along the fence line
Trees and brush from the hillside in back of the house
Ready to be cut up for firewood
Meanwhile Jeff was busy scrapping out the left side of the driveway where they will lay rock on Wednesday, so the cement trucks will have firmer ground to drive on. Dave and Jeff also picked up the Terratex fabric that will go under the rock for better support.
starting the driveway
left side of the future circle driveway
Looks like another productive day! Wednesday it is supposed to rain, but again, I am hoping for it to go a bit north or south of the lot. :) The only negative was the guys that are supposed to set the footings did not show up to take measurements and confirm the digging was correct. Sure hope they show up on Wednesday!!!