The drilling truck setting up on the south side of the house
Also the well digger was there ready to start on the 4 wells for the geo-thermo system. So, Saturday and Sunday did see quite a bit accomplished to make up for the previous week.
Monday, Jeff and Dave shopped for the supplies needed to install the electrical pedestals and started that step. Also, Caruth returned and removed the forms. Here is what the walls look like:
This view is seen as standing on the patio looking into the northeast corner of the house. On the right is the retaining wall, which will act as a shelter for the patio and define it.
Tuesday, Jeff installed the plumbing that needed to be installed in the basement floor before they spread the gravel over it in preparation for the floor to be poured.
Thanks for checking in!!!