Sunday, June 22, 2014

Catching up on House Progress

Its been a while since I have posted, but some of the daily progress doesn't make for exciting pictures.

Walls are going up

Back of house, progress has been made


 Front of house

Starting to apply Tyvec


 Getting ready to sort the trusses

Too high for me!

 Main level and lower level sunrooms

View of two garages

Back of "Airstream garage"

Trusses over sunroom and future covered deck

back of house, retaining walls define future patio & back yard for pups

South side, two large windows in living room with fireplace in between
two small windows are guest bedroom and bath
Lower level is all mostly above ground making the house look higher and larger, 
all due to the garage for the Airstream being higher. 

 Front porch and back of front garage

Lots of landscaping to be done in the future:

view from the north side by garage

View from lower level sunroom onto future patio and backyard

7 Steps up into the mudroom from front garage
house sits higher due to "Airstream garage"

Coming in from the garage

 Looking into Living room from front entryway

Back of house, master bedroom to the right, bathroom to the left with 
laundry room and mudroom in the front on the left

 Living room windows facing southeast

Living room windows with fireplace between, faces south

Dave wanted large windows; they have turned out to be much larger then he expected.   :)

Sunroom with sliding doors to covered deck

kitchen with butler's pantry and master bedroom behind it.
Hopefully walls will be up soon, so I can have
a better idea of the room sizes. 

First zoomies in new house, in the lower level family room

Check back soon for more updates!  We are having so much fun seeing our dream become a reality!!!
We are loving the area, the views and being so much closer to our three children and future grandchild!!  :)






No comments:

Post a Comment