Wednesday, September 10, 2014

September progress report

September has been a good month so far regarding the progress on the house.  Jeff and Jim replaced the final window in the front bedroom and finished the siding.  Hopefully, this Friday, the Jeld-wen techs will be here to replace all the trim on all the windows and replace glass in 8 windows.  When that issue is totally resolved I will breath a sigh of relief.

The dry-wall installers have finished the install of drywall.  The crew that will do the taping and muddying will start tomorrow.  Depending on the weather, Jeff, Jim and Roberto will start on the columns and railing on the porch or start the deck.  This week should see a good amount of progress on the house.

So as promised previously, here are some pictures of the various rooms now that there is better definition of the rooms.

This is the front garage with storage units

Steps up to the mudroom, Space on the landing for
a freezer.  See the little cubbyhole for passing grocery bags
through to the landing. 


The landing space for the freezer as seen from the mudroom door. 

The mudroom; first door on left is the door to half bath and door closes to
outside will be my cleaning supply closet. 

The entry and hallway as seen from the living room. 

The landing at the bottom of the stairs, 
door leads to a lower level bedroom

 Short hallway to back bedroom and door on left 
leads to a future lower level bathroom. 

Living room as seen from back hallway

Living room south wall with fireplace as 
seen from pantry doorway.

Sunroom as seen from front hallway

Looking toward the kitchen; the doorway leads
to the pantry. 

The master bathroom as seen from the doorway 
from the bedroom.  It's bigger then our whole trailer!!!
I could just live in the bathroom.  Ha-ha!!

The master bedroom with a door to the covered deck
and window overlooking deck.

The geo-thermo room

The door leads to the storm shelter under the front porch.

The future family room in the lower level, maybe we can
get it completed next year.

 Another view of the family room/sunroom windows.

Stairs to garage from lower level.

Airstream garage, each of the garages has 14 ft ceilings.  

We are getting so excited!!!  It has been so cold here in north central Iowa, just in the low 60's today.  We are ready to be in a house as we started the Airstream adventure in cold weather and we will be ending it in cold weather.

Thanks for checking in, hopefully I will have more pictures soon with more finish details to them.  Really looking forward to having a full kitchen and space for the dogs to run outside.  We are hoping to get a portion of the backyard fenced before winter so they have some running room.



No comments:

Post a Comment